Change note 27/08/2026 – Update 12

Pixel Airport Tycoon 3D · build 24974098 · published

On SteamNotes only · this build shipped before we watched the app

Change note 27/08/2026 – Update 12

Cargo buildings

The buildings for cold, live, express and hazmat cargo now hold a maximum of five vehicles. To operate more vehicles, build additional facilities. The fleet research remains unchanged — at the highest level, 25 vehicles per cargo type are still possible, spread across several buildings. The vehicle window now shows each building's occupancy alongside the total fleet.

The cargo terminal for regular freight is not affected.

Administration

The administration can now be upgraded through three levels, determining how many contracts may run at the same time — passenger and cargo contracts combined:

Level 1: 3 contracts
Level 2: 6 contracts — upgrade for $300,000
Level 3: 9 contracts — upgrade for $750,000

Upgrade by right-clicking the administration building. Once the limit is reached, a notice appears when signing a contract.

For existing save games

Existing vehicles and running contracts are kept, even if they exceed the new limits. Only new additions are restricted. Anyone selling vehicles and buying them again will therefore need more buildings — anyone wishing to keep their current stock can simply leave it as it is.