Launch Window: 1961 · published · build 25637483
Hi everyone,
Update 0.3, the Moonshot Update, is ready! This update takes Launch Window beyond Earth orbit for the first time.
The update adds complete lunar missions, shared launches, a new contract proposal system, and a rebuilt mission-planning flow. It also includes major changes to campaign screens, flight profiles, and the way planning choices are presented. Here's a look at what's new.
The biggest addition is a new group of lunar missions. Companies can now take on four types:
Lunar flights begin in Earth parking orbit before translunar injection. Depending on the objective, a mission may continue through lunar-orbit insertion, descent, landing, surface operations, ascent, rendezvous, trans-Earth injection, reentry, and recovery.
Transfer and descent choices affect flight time, cost, reserves, and risk. Crewed expeditions can also use a free-return trajectory as a contingency.
Contracts are no longer accepted with a single click. You now submit a proposal to the client.
An aggressive price or early date can improve a proposal, but it can also leave the company responsible for a difficult and expensive commitment.
Compatible contracts can now fly together on one rocket. After selecting the primary payload, the planner shows accepted contracts that share a workable destination, schedule, recovery plan, crew requirement, orbit, and lunar arrival profile.
A new payload-bay display shows the vehicle's available capacity and the space used by each payload before the manifest is filed.
I've also replaced the previous planning screens with one mission-specific flow. Depending on the flight, planning can now include:
The planner only shows decisions that apply to the selected mission and vehicle. Invalid combinations are blocked with an explanation. Changes to a plan update the trajectory, schedule, budget, and risk together.
Trajectory alternatives are calculated in the background so previews remain responsive while moving between choices.
Orbital missions now establish stable orbits instead of following extended ballistic paths. Circularization, parking orbits, apogee coasts, kick stages, high-orbit insertion, retrofire, and recovery appear when required by the mission.
The flight view now includes a rendered Moon at its relative scale and position, along with the Sun, a star field, atmospheric scattering, Earthshine, and adaptive exposure. Lunar arrival, orbit, and landing use Moon-relative camera views.
Suborbital reentry, staging transitions, recovery targeting, water landings, camera controls, and flight-path readability have also been revised.
The Mission Board, contract proposals, launch planner, vehicle catalog, order review, company programs, campaign progress, and mission results have been revised around a more consistent mission-control interface.
The promised date from a winning proposal now follows the mission into launch planning. Late launches remain possible, but the client reduces its payment according to the delay. The planner shows that penalty before the launch is authorized.
Vehicle assignment now consistently reserves the earliest available matching vehicle, and a ready mission opens directly into the launch scene.
As a solo developer, playtesting every possible mission path is one of the hardest parts of development. If you run into something that is obviously broken, find a planning step confusing, or have an idea for improving the game, please share it in the Steam Discussions. Bug reports and suggestions are more than welcome.
Thank you for playing and supporting Launch Window.