Interregional Line Uprates XIII adds four more levels to every line between regions: a tenth and an eleventh corridor on the Prairie Line, the North Line, the Sunbelt Link and the Gulf Link (up to 163,000 MW), and up to four more overlay bipoles or bipoles on every tie into a bought region.
Plant Bay Uprates II adds two more levels to the switchyard bays of your solar farms, wind sites, engine plants and every battery park, and to the pad substations on your land sites.
Every reprocessing complex can reach a new tier, the Five Train Complex: research Five Train Licensing and every slot goes a level further.
Research you cannot start yet no longer shows as available after a game update while you are playing. Thanks to jtoiletpaper for the report.
A fourth round for your solar and wind in the Market Operator era: Next-Generation Repowers IV and Onshore Repowers IV add two more levels to your array and tracker rows, solar blocks, tracker blocks, steep arrays, roof arrays, carports, canopy sections, turbines and turbine strings, and Collector Substation Uprates IV carries the extra power to the grid.
Four Hour Block Uprates II, Plaza Battery Cells III, Megawatt Charging IV and Home and Street Retrofits V add two more levels to the four hour battery blocks (with new switchyard bay levels at Maplewood Station), plaza batteries, superchargers and the gear at the house and on the street, the bike included.
The Company HQ grows again: Campus Master Plan IV adds two levels to nine of its rooms and Trading Floor Expansion III two to the Market Operations Floor.
The switchyard bays at the battery parks of bought regions now show their own ratings in their level names.
Worn reactor units can be serviced: send a Nuclear Technician from the unit's panel or the Dispatch Board, and every refueling now also restores the condition of the unit it refuels. Worn reactor units no longer claim to lose output, since they trip more often instead.