Another round between regions, and bigger station lines

GridController · published

  • Interregional Line Uprates XIV adds four more levels to every line between regions: a twelfth and a thirteenth corridor on the Prairie Line and the Shield Line (up to 191,000 MW) and on the Sunbelt Link and the Gulf Link (up to 187,000 MW), and four more overlay bipoles or bipoles on every tie into a bought region, about a fifth more power on each of those ties. Your hubs already carry all of it, even with one line out.
  • Quad Superconducting DC Links: new Continental Grid research lays a fourth cable in the triple links' trench, 208,000 MVA a line, for the biggest reactor stations.
  • Continental Turbine Islands and Continental Reliability Center now open a third level each, and Continental Plant Yards III adds two more plant switchyard levels (52,800 and 55,200 MW) to carry them.