Two more rounds between regions, a welcome back that gets you moving, and smo...

GridController · published

  • Interregional Line Uprates XV and XVI each add eight more levels to every line between regions: eight more corridors on the Prairie Line and the Shield Line (up to 303,000 MW) and on the Sunbelt Link and the Gulf Link (up to 299,000 MW), and sixteen more bipoles, overlay bipoles or converter stations on every tie into a bought region, about 70% more power on each of those ties.
  • Meshed Hub Rings: new Market Operator research adds four more steps to every hub and bulk substation, up to 48,000,000 MVA, so your hubs keep carrying the biggest lines between regions with one line out.
  • While you were away now opens with what is waiting for a crew: tripped units, outages, line faults and plant work, counted and in the Dispatch Board's order, each with the board's own button (dispatch the first free crew, or call out the contractor when no line crew is free), so nothing sits idle for days after you come back.
  • The Get licensed step now says when your sales to the neighbors fill the 2 kWh at today's pace, or that they will not and what raises them.
  • Smoother frames: on Chrome, Edge and the desktop app a strong graphics card no longer waits on a late "frame done" signal, so it can draw at your display's full rate. Auto graphics steps down only when the game itself is slow (not when the window sits in the background) and steps back up once there is room again. Low detail smooths edges with a lighter method that is easier on built-in graphics.
Two more rounds between regions, a welcome back that gets you moving, and smo... · GridController patch notes · SteamPeaks