Demo Patch: An easier start (Build-ID 25672566)

Timberline Factory · published · build 25672566

(Build-ID 25672566)

Thanks for playing, and for the first round of feedback. This update removes a few early traps so the sawmill can get running sooner.

**The mill**

  • Machine parts break less often. In the demo there is also more time between two breakdowns.

  • Titanium conveyor upgrades unlock after the debarker. The upgrade button stays visible and shows when.

  • Fast conveyors and the tapered roller conveyor can be bought from day 15. The cheaper standard conveyors are available from the start.

**Contracts and goals**

  • The first two completed “deliver logs from a box” contracts ask for fewer logs. After that, amounts are back to normal.

  • The early side goal “days without a repair” only appears once the headrig line is built. Until then the side goal is “deliver logs in one day”.

**Hints**

  • When the first logs land in the sort box, a hint explains how to sell them.

  • If a log falls off the line, a hint points to the speed being too high or the gap being too small.

**Fixed**

  • Logs at the infeed sometimes sat still and did not roll on. That is fixed.

Good luck at the mill.

Demo Patch: An easier start (Build-ID 25672566) · Timberline Factory patch notes · SteamPeaks